> Start on a date, stop on a date, or cap the run length. All in your project's timezone. Auto-stop lands the test in Paused, never in the trash.

Most tests you start manually and stop when the verdict is in. Some
tests benefit from a schedule, a Black Friday hero, a launch-day
homepage, a seven-day validation on a limited feature. That is what the
Schedule section handles.

> [!NOTE]
>
> **Availability.** Scheduled starts, ends, and max-run-days are on the
> **Starter plan and above**. Legacy Free accounts can still start and
> stop manually. The free tier closed to new signups on 5 September 2026;
> see [the Free tier](https://docs.abtestly.com/plans.md#the-free-tier). See
> [pricing](https://abtestly.com/pricing).

## Three fields

Under **Schedule** in the editor, you can set any combination of:

* **Start date and time.** When to flip the experiment from Draft to
  Live. Defaults to "start when I click Start now".
* **End date and time.** When to auto-stop. Blank means run until you
  stop it.
* **Stop after (days).** A safety cap, labelled "Stop after" in the
  editor. If set, the test auto-stops that many days after it actually
  starts. It counts 24 hour days from the start instant, not calendar
  days, so a cap that spans a daylight-saving change lands an hour off
  the original local time.

The start and end fields use your **project timezone**, which is set
once per site under [Settings → General](https://docs.abtestly.com/settings/general.md). If your
project is America/New\_York, "9 AM" means 9 AM Eastern. The editor
labels each field with the zone and its current UTC offset.

> [!WARNING]
>
> What gets stored is the **exact moment** your wall clock time resolves
> to, not the wall clock time itself. If you schedule 9 AM Eastern in
> October and the experiment starts in November, after the clocks change,
> it starts at 8 AM Eastern. Changing your project timezone later
> re-displays an existing schedule, it never moves it.

## Use Schedule for later, not Save changes

Fill the schedule fields, then click **Schedule for later** at the
top-right. That one button does everything: it saves the experiment and
flips its status to **Scheduled**.

> [!WARNING]
>
> **Save changes** does not apply a schedule. On a draft it saves
> everything else and silently drops the start, end, and stop-after you
> just typed. The editor warns you when this happens, with a "Saved, but
> not scheduled" message. If you see it, click **Schedule for later** to
> actually schedule the test.

Scheduled does not mean live. A job runs every minute, picks up
experiments whose start time has passed, and starts them, so a start
can land up to about a minute late.

To cancel a schedule and put it back to Draft, use **Cancel schedule**
from the row menu or the detail page.

## Auto-stop lands in Paused

When the end date arrives (or max-days is hit), the experiment
transitions to **Paused**, not Archived. Nothing is deleted. The
results page stays available and any team member with the right role
can review, then choose to **Resume** or **Archive**.

> [!NOTE]
>
> Auto-stop does not notify anyone. There is no email and no alert when a
> test stops itself. The experiment moves to Paused and waits. If your
> day-seven test needs a day-eight look, put that reminder in your own
> calendar.

## What happens to bucketed visitors on auto-stop

Existing bucketed visitors stop seeing the variant on their next
pageview, once the new configuration reaches them. Allow a few minutes
end to end: up to about a minute for the stop itself, then up to about
three more while the previous configuration ages out of the caches
between us and the visitor's browser. Historical data is preserved and
the results page keeps working.

## Scheduled + activation triggers

A scheduled experiment respects its activation trigger like any other.
If your test is set to **On click** and cron starts it at 9 AM, the
first exposure fires when the first eligible visitor clicks, not at 9
AM sharp.

## Corner cases

**Start date in the past**, rejected. Use **Start now** instead.

**End date before start**, rejected.

**Less than five minutes between start and end**, rejected. The whole
window could otherwise elapse between two runs of the job that starts
and stops experiments.

**End date without a start**, allowed, but it cannot be *scheduled*.
Moving an experiment to Scheduled requires a start time in the future.
An end date on its own takes effect when you click **Start now**, and
becomes the auto-stop.

**Stop after and end date both set**, whichever comes first wins.